• Upper: Square Raised Panel
• Lower: Square Raised Panel
• Slab Drawer Front
• Glass Doors: Mullion
• Lead Time: 2 Weeks
• Maple & Cherry
• Price Category:
I - Maple
J - Cherry
• Special Size Door & Drawer
Front: Same 2 Weeks Lead Time
• Shaker Door
• Panel Raised: 1/2” Reverse G-cove
• Edge Profile: Machine Edge
• Frame Bead: Madison
• Slab Drawer Front
• Lead Time: 4-6 Weeks
• Price Category:
M - Oak
N - Maple
O - Cherry
• Miter Door
• Raised Center Panel
• 5 Piece Drawer Front
• Glass Doors: Mullion
• Lead Time: 2 Weeks
• Maple & Cherry
• Price Category:
K - Maple
K - Cherry
• Special Size Door & Drawer
Front: Same 2 Weeks Lead Time
• Shaker with Eased Inside Edge
• Matching Drawer Front
• Optional Coordinated Back
• Glass Doors: Single Lite
• Lead Time: 2 Weeks
• Price Category:
H - Standard Colors
I - Premium Colors